Using Quota Corrections ( Infotype 2013 ) , How ?

Question:
Dear Al
I'm trying to change the absence quota which generated by time evaluation using Infotype Quota Correction ( Infotype 2013 ). I already fill number of days increased into infotype 2006 and choose transfer immediately on field "Transfer"
From customizing side , I've already customise " PERMIT GENERATION OF QUOTAS IN TIME EVALUATION " and choose "INCREASE "
But when I finish save Infotype .no number of days updated in infotype 2006
How to sove this problem ?/
Regards
Denada
Answer:
Hello friend,
Recently, i had a same problem , After running a time evaluation, tried to use PT50 (quota overview) and Infotype 2013 Quota correction. I could't do anything bcz, bcz, Time Evaluation, has't generated any quota for that Absence Type. Solution for this, When u r running Schema, find the line, where function QUOTA is there , use UPDTQ as a parameter, for that function. It will generate,Accrual Absence entitlement.(Dont forget "INCREASE"). Following Information is might helpfull for you.
Permit Generation of Quotas in Time Evaluation
In this step, you specify that an absence quota is accrued automatically during time evaluation.
Entitlements van be accrued in the Absence Quotas infotype in one of two ways:
1. The system calculates the entitlement anew each time and overwrites the existing value in the Absence Quotas infotype (2006). These quota types are referred to as those that are replaced.
Note: Absence quotas that are replaced should be processed by time evaluation once only, that is, these should be able to be updated only by function QUOTA, only by a time transfer, or only by operation UPDTQ. In any other case, the quota number cannot be determined as you require.
2. The system calculates the entitlement acquired during the current accrual period and adds this value to the existing infotype record. These quota types are referred to as those that are increased.
The quota number determined during time evaluation cannot be changed in the Absence Quotas infotype (2006). You can use the Quota Corrections infotype (2013) to correct the quota number of quotas that are increased, but not of quotas that are replaced.
Regards
snkumar
Answer:
In short, you have run time evaluation after giving "Transfer immediately" in the 2013 infotype
Bye,
manish

More Articles:

Local printing problem?
Semi-monthly Payroll Runs?
session not get expired in ITS?
Cost Centers in PA?
Payroll Wage and Tax Deposit Reports?
cats?